Written by Tim J. Swendseid, PE, MBA, CFA| President of Consulting Services – Americas
In its role as an independent engineer (IE) on behalf of various lenders, RPMGlobal is asked to perform pre-loan approval due diligence on mining projects in order to identify risks that might affect a borrower’s/sponsor’s ability to repay debt.
Published once a quarter, our technical mining papers are recognised throughout the industry for their detailed insights into the geology, engineering, and logistics of mining.
Perspective
Advisory