Written by:
Stuart Smith | President – Consulting and Advisory – Americas
This edition explores capital cost overrun accounts for mining operations, recent data on these cost overruns and their chief drivers, as well as an analysis of the market context and relevant recent trends. It presents practical approaches for mitigating cost overrun accounts and outlines RPMGlobal’s capabilities and processes for managing them.
« * » indique les champs nécessaires
Published once a quarter, our technical mining papers are recognised throughout the industry for their detailed insights into the geology, engineering, and logistics of mining.
Perspective
Advisory